The Schedule Variance Cost Analysis (Detail) report compares and details the cost variance between the scheduled shifts and the actual shifts worked by hourly employees.
The Summary section, located at the bottom of the report, includes the following:
Field | Description |
---|---|
Store | Number and name of the store associated with the labor details. |
Clock In |
|
Clock Out: |
|
Short Break |
|
Total Cost | The total cost of the schedule variance. |
- Shifts that do not meet predefined time card parameters will not be included on the Schedule Variance Cost Analysis report. The following note is displayed in the details section of the report:
- How is the variance determined between a scheduled shift and an actual shift?